Tincopalca

2,390 hectares
Precious metals

At a glance

2,390 hectares

Total area of the property

Average 3,820 masl

Height above sea level

Open pit

Anticipated mine type

Precious metals

Primary commodity targeted

Permitted to produce

Production milestone

100%

Ownership

Figures describe the licensed ground and the stage of technical work completed on it. No mineral resource or reserve has been declared for this asset. No joint venture, streaming or private royalty interest in this asset is held by any third party.

Overview

One of five mineral assets in Xstreco's Peruvian portfolio and part of our precious-metals pipeline. Tincopalca lies at an average 3,820 metres above sea level in Castrovirreyna province, Huancavelica department, further south than the rest of the portfolio, reached from the coast through Chincha Alta then inland to Huachos, the final approach on a bridle path. The operating permits required to move into production have been granted.

Location

Huancavelica

By-products

Copper

Access

Via the Panamericana Sur to Chincha Alta, then Carretera 26 to Huachos, approximately 95 km, and a final 2 km on a bridle path

Permits and approvals

The operating permits required to move into production have been granted. The property is not yet in production.

How activities are assessed

Work programme

The geological setting of the property and the exploration programmes completed on it.

Geological setting

Tincopalca lies in a mineralised belt on the western flank of the Andes in southern central Peru. The property is underlain by a volcanic sequence, with sedimentary and intrusive rocks nearby, and mineralisation in the belt is structurally controlled.

Work completed

Three programmes were completed in 2024: reconnaissance rock sampling, a ground induced polarisation and resistivity survey, and a coincident ground magnetic survey. The geophysical work identified chargeability anomalies and proposed drill targets. The anomalies remain open, and the contractor recommends extending the survey.

Programme type
Coverage in general terms
Year
Rock geochemical sampling
Reconnaissance rock sampling across the property
2024
Induced polarisation and resistivity, three-dimensional
Survey grid over the central sector
2024
Ground magnetics
Coincident with the induced polarisation grid
2024

Xstreco is privately held and is under no obligation to publish mineral resource or mineral reserve information. No resource, reserve or production figure is published on this page. Detailed technical information is available to qualified parties on request.

Working responsibly

A single framework of our Group requirements applies to every activity on this property.

Communities

Stakeholder engagement, citizen participation, Indigenous peoples engagement, social impact and local content.

Communities

Environment

Water, biodiversity, waste, emissions and closure, assessed through the Peruvian environmental instrument that applies to the activity.

Environment

Health and safety

Hazard identification, critical risk control, emergency preparedness, incident investigation and contractor safety.

Health and safety

How we work with communities

Our assets sit in settings where farming, pasture and settlement long precede mining. Engagement is with people already living on the ground.

Engagement continues for the life of the activity and through its closure.

Our approach to communities

News and notices

Updates relating to this asset, most recent first.

March 1, 2026
Tincopalca: production planning completed

Xstreco completed the engineering definition, the plant configuration and the cost planning for small scale pilot production at the Tincopalca property in March 2026. The property holds the operating permits required to move into production.

October 28, 2024
Tincopalca: ground geophysical survey completed

A ground induced polarisation, resistivity and magnetometry survey was completed at the Tincopalca property between September and October 2024, and proposed positions for future drill testing.

July 27, 2024
Tincopalca: reconnaissance rock sampling programme completed

A reconnaissance rock sampling programme was completed across the Tincopalca property and reported by a commercial testing laboratory in July 2024.

August 31, 2007
Tincopalca: 2007 geological and geochemical evaluation

An evaluation of the Tincopalca property completed in 2007 mapped the local geology and altered zones along a faulted contact, and took a reconnaissance sample suite.

Detailed information

Detailed technical and financial information on this asset, including the independent field reports held on file, is available to qualified parties on request.